Close Menu
Mahi NewsMahi News
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Mahi NewsMahi News
    Subscribe
    • Home
    • National
    • International
    • politics
    • campus
    • Game
    • Entertainment
    Mahi NewsMahi News
    Home»News»Barapukuria Thermal Power Plant Resumes Production
    News

    Barapukuria Thermal Power Plant Resumes Production

    DMN DeskBy DMN DeskApril 25, 2026 5:46 AMNo Comments1 Min Read
    Facebook Twitter Pinterest Reddit Telegram LinkedIn Tumblr VKontakte WhatsApp Email
    Share
    Facebook Twitter Reddit Pinterest Email


    0

    Production at Dinajpur’s Barapukuria Thermal Power Plant has resumed after a prolonged 48-hour shutdown caused by mechanical faults. The plant recommenced operation today, Friday (April 24).

    Last Wednesday (April 22), around 10 PM, Unit 1, with a production capacity of 125 megawatts, shut down. This halted production across all three units of the thermal power plant, leading to power outages in Dinajpur and 8 other northern districts.

    Read More:  US Missile Stockpile Significantly Depleted After Iran Conflict, Sparking War Concerns

    Prior to this incident, Unit 2, with a capacity of 125 megawatts, and Unit 3, with a capacity of 275 megawatts, of the same power plant had already been shut down for a long period.

    It is noteworthy that the coal-fired Barapukuria Thermal Power Plant was established next to the Barapukuria coal mine in Dinajpur in 2006, utilizing coal produced from the mine. Initially, two units, each with a production capacity of 125 megawatts, totaling 250 megawatts, were installed.

    Read More:  Government Aims to Build Creative and Responsible Human Resources: Prime Minister

    Subsequently, in 2017, another unit with a 275-megawatt production capacity was launched, increasing the plant’s total capacity to 525 megawatts. However, due to mechanical faults and various other complexities, the power plant has never been able to produce electricity at its full 525-megawatt capacity simultaneously.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Reddit Email
    Previous ArticleAir Defense System Suddenly Activated in Tehran
    Next Article Two More Ships Arrive at Chattogram Port with Over 68,000 Tons of Diesel

    Related Posts

    Weather Warning Issued for Dhaka and Across Bangladesh

    April 30, 2026 12:24 PM

    Soybean Oil Price Increases – Bangla Online News Portal

    April 30, 2026 6:04 AM

    Storm Forecast for 17 Regions, River Ports Advised to Hoist Warning Signal No. 1

    April 29, 2026 3:05 PM

    Finance Minister: Initiatives to Control Counterfeit Notes with New Laws and Technology

    April 29, 2026 5:30 AM
    Latest News

    Weather Warning Issued for Dhaka and Across Bangladesh

    April 30, 2026 12:24 PM

    Soybean Oil Price Increases – Bangla Online News Portal

    April 30, 2026 6:04 AM

    Storm Forecast for 17 Regions, River Ports Advised to Hoist Warning Signal No. 1

    April 29, 2026 3:05 PM

    Finance Minister: Initiatives to Control Counterfeit Notes with New Laws and Technology

    April 29, 2026 5:30 AM

    Democracy cannot be established in a country where human rights are absent: Prime Minister

    April 29, 2026 1:21 AM

    Home Minister: 14,500 New Posts Being Created in Police

    April 28, 2026 11:12 PM
    © 2026 Mahi News

    Type above and press Enter to search. Press Esc to cancel.